municipal
highway repairs

Highway Overpass Void Fill

LOCATION

Alberta, Canada

Project Details

Alberta Highways had compacting soil issues leaving important structural parts exposed. Limited access prevented conventional concrete solutions. FillFoam Canada extended the vertical culvert with light gauge metal sheeting to create a tube around the I-beam, then void-filled with FillFoam™ to protect the beam while allowing required flexibility and movement. Two 1-inch access holes at the top allowed complete filling. The two-man crew completed the job in 1 day—a project that would have taken weeks with conventional methods and required deconstructing existing overpasses.